Construction of national road No. 42 on the section from Krakowska street to the turn into Legionów street in Skarżysko – Kamienna (from km 248+500 to km 249+743)

Road system project with a total length of about 1.7 km, including a section of national road 42 class GP 1/2 with a length of about 1.3 km and engineering structures: - bridge on the Kamienna river w...

Nowy Świat street in Gdańsk Osowa - stage I

Construction project of class Z 1/2 street with a total length of the road system of about 3 km together with complete infrastructure and technical specifications.

Access infrastructure to the area of the Industrial Waterfront reported for implementation within the Sector Operational Programme - Transport

Project study (2001), programme and spatial conceptual design (2003) and feasibility study (2004) of the construction of the section of Ku Ujściu street, class Z 1/2 with a length of about 600 m and s...

gallery

Reconstruction and strengthening of national road No. 22 in the town of Starogad Gdański together with arrangement of the adjacent communication system.

All-inclusive reconstruction project of the section of national road No. 22, class GP 1/2 with a length of about 5.3 km together with infrastructure. Under the contract location applications were prep...

Extension of Wajdeloty street in Gdańsk.

Construction and implementation projects in elaboration Street Extension together with elements of traffic reduction within the street revitalisation programme.

Extension of road system, construction of tunnel and footbridge for the area of the streets of: Droga Gdyńska, Władysława IV, Świetojańska, Al. Marsz. Piłsudskiego and Św. Maksymiliana junction.

Construction and implementation projects in elaboration Project implemented as a vital element of the communication system in Gdynia, construction of the "Pink Road". The junction will impr...