Road system project with a total length of about 1.7 km, including a section of national road 42 class GP 1/2 with a length of about 1.3 km and engineering structures: - bridge on the Kamienna river w...
Construction project of class Z 1/2 street with a total length of the road system of about 3 km together with complete infrastructure and technical specifications.
Project study (2001), programme and spatial conceptual design (2003) and feasibility study (2004) of the construction of the section of Ku Ujściu street, class Z 1/2 with a length of about 600 m and s...
All-inclusive reconstruction project of the section of national road No. 22, class GP 1/2 with a length of about 5.3 km together with infrastructure. Under the contract location applications were prep...
Construction and implementation projects in elaboration
Street Extension together with elements of traffic reduction within the street revitalisation programme.
Construction and implementation projects in elaboration
Project implemented as a vital element of the communication system in Gdynia, construction of the "Pink Road". The junction will impr...