Ecological ring road of the town of Pruszcz Gdański
Project (2001 - 2002) of a class Z 1/2 route with a length of about 2.9 km together with infrastructure
The ring road project includes the route from the intersection with Grunwaldzka street to the intersection with Kopernika street and PCK street to the intersection with Obrońców Westerplatte street. Along the road system an 8-span flyover was designed running above the railway track with a length of 218 m and a 3-span road bridge with a length of 30 m. The bureau also developed a feasibility study and its updated version (2003), which was well assessed by the Control Committee under the Marshal of the Pomeranian Voivodeship. In 2005 arrangements were obtained and a decision approving the construction project and granting building permit.