Construction and implementation projects in elaboration.
Street Extension together with elements of traffic reduction within the street revitalisation programme.
Construction and implementation projects in elaboration.
Project implemented as a vital element of the communication system in Gdynia, construction of the "Pink Road". The junction will i...
Multi-sector conceptual design.
Programme of municipal infrastructure construction, including road infrastructure, in the area of the "Young City" in the site of the former Gdańsk Shipyar...
Multi-sector programme and spatial conceptual design of the Green Road and Nowa Spacerowa street in Gdańsk of GP 2/2 class the length of about 13.1 km together with engineering structures and infrastr...
Construction and implementation projects of a G 1/2 class street (ultimately G 2/2) with a length of about 4 km and class Z roads with a total length of about 2.9 km and a 5-span bridge over the Babic...
Project of a Z 2/2 class street with a length of about 1.7 km and class L 1/2 streets with a total length of about 0.7 km and conceptual design of the section of Polska street from Chrzanowskiego stre...
Project (2001 - 2002) of a class Z 1/2 route with a length of about 2.9 km together with infrastructure
The ring road project includes the route from the intersection with Grunwaldzka street to the...
Conceptual design (2002) and all-inclusive project (2004 - 2005) of a class GP 1/2 voivodeship road with a length of 4.6 km, class Z 1/2 roads with a total length of about 1.3 km and access roads toge...
Road system project with a total length of about 1.7 km, including a section of national road 42 class GP 1/2 with a length of about 1.3 km and engineering structures: - bridge on the Kamienna river w...