Main page

Executed projects

Access infrastructure to the area of the Industrial Waterfront reported for implementation within the Sector Operational Programme - Transport

Project study (2001), programme and spatial conceptual design (2003) and feasibility study (2004) of the construction of the section of Ku Ujściu street, class Z 1/2 with a length of about 600 m and s...

gallery

Construction of the town of Ełk ring road from Kolonia street to the exit in the direction of the City of Olsztyn within national road No. 16

Construction and implementation projects in elaboration Route the length of 4 km having the parameters of an expressway

Tramway to the Chełm District in Gdańsk on the section from 3-go Maja street to the terminus at Ptasia street

Construction and implementation projects in elaboration. Construction project in the Design-Build system - leader of the TORPOL S.A. Poznań consortium

gallery