Project study (2001), programme and spatial conceptual design (2003) and feasibility study (2004) of the construction of the section of Ku Ujściu street, class Z 1/2 with a length of about 600 m and sections of class L 1/2 streets: Chemików, Nowa Chemików, Ku Ujściu with a total length of abouto 1.3 km together with an arched road flyover with a length of 56 m plus infrastructure. In 2005 construction and Public Procurement act for the task entitled: "Access to Industrial Waterfront and Reconstruction of Industrial Waterfront on the section III-2" (Subcontractor - Aquaprojekt). In 2006 commenced investment implementation.