Main page

Executed projects

Ring roads for the towns of Kamień Krajeński and Sępólno Krajeńskie as well as Węcbork.

Technical, economic and environmental studies together with conceptual designs in elaboration.

Extension of Wajdeloty street in Gdańsk

Construction and implementation projects in elaboration. Street Extension together with elements of traffic reduction within the street revitalisation programme.

Extension of road system, construction of tunnel and footbridge for the area of the streets of: Droga Gdyńska, Władysława IV, Świetojańska, Al. Marsz. Piłsudskiego and Św. Maksymiliana junction.

Construction and implementation projects in elaboration. Project implemented as a vital element of the communication system in Gdynia, construction of the "Pink Road". The junction will i...

gallery

"Extension and modernisation of the rainwater drainage system in Gdynia" within the project: "Upgrading cleanness of the Baltic Sea water by developing water management systems"

Project in elaboration. Programme of comprehensive diagnosis of the condition of storm water drainage and open water-courses with the programme of system reconstruction and construction of treatmen...

Road system: Nowa Spacerowa - Droga Zielona [Green Road] on the section from the Tri-City Ring to Marynarki Polskiej street, including the optional concept of the section from the Tri-City Ring to Gospody street (on the borderline between Gdańsk and Sopot

Multi-sector programme and spatial conceptual design of the Green Road and Nowa Spacerowa street in Gdańsk of GP 2/2 class the length of about 13.1 km together with engineering structures and infrastr...

gallery

Street construction of G 1/2 class together with a bridge within the district of Modrzewina in the city of Elbląg

Construction and implementation projects of a G 1/2 class street (ultimately G 2/2) with a length of about 4 km and class Z roads with a total length of about 2.9 km and a 5-span bridge over the Babic...

gallery

Construction of sewerage system for the localities of Kolincz-Owidz-Barchnowy plus extension and modernization of wastewater treatment plant in Owidz.

All-inclusive construction and implementation documentation of the sewerage system with a total length of about 15 km, including 14 pumping stations with submersible pumps, modernisation and extension...

Sanitary sewerage system in the Łostowice district in Gdańsk

Road system project with lighting for the Łostowice district and sanitary sewerage system with a length of about 3.2 km, including: gravity channel f300 L=100m, f250 L=1039m, f200 L=1364m, storm water...

Modernisation of the streets of: Polska, Rotterdamska and Celna in Gdynia

Project of a Z 2/2 class street with a length of about 1.7 km and class L 1/2 streets with a total length of about 0.7 km and conceptual design of the section of Polska street from Chrzanowskiego stre...